Construction on the building has been moving quickly these days. Installation of electrical wiring and plumbing has begun. The electrical and plumbing work began on the 5th floor (like all other building construction), and work will continue to the floors below.
Hall lighting has been installed on all residential floors, and electrical is visible in all residential units on the 5th floor. The black pipes seen below are the first steps in the plumbing installation.
The electrical and plumbing work began on the 5th floor, like all other building construction, work will continue to the floors below.

Black pipes are plumbing that has been installed and electrical installed in several spots

Electrical wiring installed on 5th floor

Hall lighting has been installed on all residential floors